Preparation
Clean the wall(s) by removing any debris, rubble, dirt, etc.
Dampen the area of installation. Ensure the area is moist but not soaked.
Mixing
- Pour the liquid Basecrete into a mixing container first.
- Add the dry mix on top of the liquid Base-Crete.
- Do not add water.
- Aim for a "milkshake" consistency. If the mixture is too thick, add more liquid Basecrete.
- The reference mixture is 1 gallon of liquid Base-Crete per 50lbs dry mix bag (covers 40-50 sqft @ 1/8” thick).
Mixing Process
- Mix the liquid and dry mix until you achieve a milkshake-like consistency.
- Let the mixture sit for 4 minutes.
- Re-mix the mixture for 1 minute.
Application using Troweling
- Apply 1/8” thick at a time using a trowel.
Application using Spraying
- Apply 1/16” thick at a time using a sprayer.
Application using Rolling
- Apply 1/16” thick at a time using a roller.
- Make only two passes – one pass vertically and one pass horizontally.
Post-Application
- If the customer wants to paint over the Basecrete, they will need to use a different product like epoxy.
- Wait for 4 weeks before painting.
- Saturate the surface with water and neutralize with a 1:8 solution of muriatic acid.
- Rinse with clean water after neutralizing.
Tools Needed
- Trowel
- 5 gallon Buckets
- Sponge
Materials Needed
- Liquid Basecrete
- Dry Mix
- Water